However, it took about one hour till we set up all the equipment, we gone through to the rehearsal first for the whole 30-minute to make sure that everything will go well. Moreover, after we gone through the rehearsal it did helped us how to do all show in once. So therefore, we gone through the live show and it went really well, which we had to go through the live show and do it in once and we have to do exactly 30-minute and we done 30-minute 15 second which we was really pleased with it. Overall I think it went very well and everyone did their job well and communication was good as well. Furthermore, after our group finished the 30-minute live show we de-rigged all the equipment which second group have to set up again during their live show which gone live after lunch break and totally I think it went well for both group. The only thing I want to discuss here is de-rigging for second group which I saw again it wasn't good teamwork again as usual after they finished their live show there was only couple of students de-rigging the equipment and the rest was in the computers and some of others went home. The first group crew details are in below
First name | Surname | Role |
Ashley | Artingstall | Director |
Nyasha | Tsikai | Floor manager |
Jack | Ware | Vision mixer |
Matthew | Jump | Producer – guest |
Fred | Velody | Runner |
Erin | Roche | Presenter |
Andrew | Tabner | Sound mixer |
Danny | Jack | Camera 1 |
Luis | Winder | Camera 2 |
Mikael | Hasanzad | Camera 3 |
Second group
First name | Role |
Josh | Director |
Imogen | Floor manager |
Kas | Vision mixer |
Joe | Producer – guest |
Rebecca | Presenter |
Andy Greenland | Sound mixer |
Abid | Camera 1 |
Ezra | Camera 2 |
Luke | Camera 3 |
Also there is some pictures from today I would like to share here.
No comments:
Post a Comment