Today lesson was the final show for the music (Unsigned & Defined) which we had our assessment. However, firstly in the morning we start set up all the equipment needed for the show such as tricaster, red headlights, cameras and etc.
During setting up the equipment especially when I was setting up the red headlights the sockets power went off due to the one of the lights which after I found out it should have separated extension for the red headlights because its 800 V and it takes a lot of electric power.
Also during setting up the preview monitor for studio the BNC cable didn’t work, so we used the component cable to connect the preview monitor for the studio and finally find solution for the problem we had. Furthermore after checking all the equipment we went to the lunch break, then after lunch when we back we had a crew meeting which was useful and then each person went to their job role. The 1st group which Luis was directing went first and I was the part of the 1st group and my role was camera operator. During the show we face a small problem with talk backs, when Luis was talking to us I couldn’t hear him properly due to the rustle coming from talk backs. But otherwise I think we done quite good job today and I think it went very well and communication was very good.
The 1st two act performed was 1- Josh Lipman 2- Elliot Beese.
Also the 1st group crew team was

Name
Roles
Luis
Director
Jack
Vision mixer
Andrew Greenland
Sound mixer
Nabeel
Online net
Abid
Floor manager
Danny Jack
Camera 1
Ashley
Camera 2
Mikael
Camera 3
Rebecca
Floor manger 2
Kassem
Camera 4
Erin & Matthew
Presenters
Ezra
Online net


Also this is the video from the first group





Moreover, after 1st two bands performed and 1st group done they roles 2nd group take over and they start their assessment as well.
The 2nd group done good job as well but they face problem when they was in live and the band was performing the tricaster froze and they could not do anything about it and they have to continue recording. Overall, I think they done good job and had good communication as well and the only issue was equipment which we couldn’t do anything about it because it was working before we start recording the show.
The 2nd two performers was 1- Yu Min Kang 2- Dani France.
Also the 2nd group crew team was.

Name
Roles
Ashley
Director
Josh
Vision mixer
Danny Ainsworth
Sound mixer
Andrew Tabner
Online net
Imogen
Floor manager
Ezra
Camera 1
Fred
Camera 2
Luke
Camera 3
Joe
Floor manager
Nyasha
Camera 4
Mathew & Erin
Presenters
Ezra
Online net

In my view all the show went very well and I think we all done very good job which we all should be pleased with what we done today and I think it was much better then last module we done in Lever Street, there was some issues which we can have solution for it in future projects such as communication I think we can make it better and stronger also the equipment if we get better equipment I think we will do better job.